25T Rubber Tyred Gantry Crane Delivered to the USA

Project Overview
The customer operates an outdoor yard in the United States and regularly handles large HVAC units that require careful storage and movement. Previous suppliers could only offer standard lifting equipment at high cost, failing to meet the customer’s need for a customized, cost-effective material handling solution. Seeking greater flexibility and reliability, the customer turned to AICRANE.
Product:DTLS-25T rubber tyred gantry crane
Application:Used for large HVAC handling
Installation time:December 2025
Location:San Antonio, USA

Project Requirements & Challenges
The project required a tailored lifting solution capable of operating safely and efficiently within limited yard space, while ensuring stable handling of large and valuable HVAC units.

Space Constraints: The RTG crane needed minimized external dimensions to fit the existing yard layout.
Operational Stability: Despite the compact design, stable and safe lifting performance had to be guaranteed.
Lack of Customization from Previous Supplier: The former supplier could only provide expensive standard models, unable to meet specific operational requirements.
Our Solution
AICRANE delivered a fully customized DTLS rubber tyred gantry crane featuring a double main beam design, with a 5.5 m span and 7.1 m lifting height.

Compact Custom Design
The crane was engineered with reduced overall dimensions to suit the yard’s spatial limitations.
Stable Lifting Performance
Structural optimization ensured smooth and stable operation during HVAC unit handling.
Tailored Engineering & One-Stop Service
From design and manufacturing to transport and installation, AICRANE delivered a complete turnkey solution.
Results & Value Delivered
Through professional consultation, customized design, and reliable delivery, the project was completed successfully. The RTG crane now operates safely and efficiently in the customer’s outdoor yard, significantly improving handling efficiency for large HVAC units.

- Project completed within agreed schedule
- Customized solution reduced procurement risk
- Approximately 20% cost savings compared to the original supplier’s standard solution